Keluosikai 12m Electric Self Propelled Scissor Lift

SKU: RDX4126

د.ك 4,699.000

Description

The Keluosikai 12m Electric Self Propelled Scissor Lift delivers powerful and quiet vertical access for industrial operations. Its electric drive ensures smooth self propelled movement with precise control. Designed for stability, it supports up to 400 kg load capacity. Ideal for warehouses, maintenance and installation work.

Key Features:

  • H1 Working Height: 12m
  • H2 Platform Height: 10m
  • Drive Type: Electric Self Propelled Scissor Lift
  • Load Capacity: 400 kg
  • Operation: Smooth elevation with stable platform control
  • Application: Suitable for indoor industrial environments

In stock

19 People watching this product now!

Fast Shipping

Carrier information

20k products

Payment methods

24/7 Support

Unlimited help desk

Same day Delivery

Track or off orders